  • Which statement below correctly identifies one floor below the damaged level for shoring in wood or lightweight steel frame structures?
  • Which option lists common cribbing configurations used to create stable platforms?
  • Precast parking facilities are generally one to fourteen stories tall.
  • What is a primary purpose of ventilation in a collapse scenario?
  • How hot can an exothermic cutting torch operate at?
  • Which factors influence the selection of cribbing components for stabilization operations?
  • How often should you rotate teams during operations?
  • What is the recommended approach to patient packaging in a collapsed structure?
  • How should fatigue be managed during a long stabilization operation?
  • Which term completes the sentence: Rescuers should avoid cribbing or _____ them closed?
  • Which of the following is a common indicator that ventilation is needed in a collapsed structure?
  • To limit fatigue and injury, you should work within the capabilities of the _____ and use the tool properly.
  • The five collapse patterns are generally associated with _____ construction but may be present in all types of construction.
  • Why is it essential to maintain a stable stance and avoid overreaches during stabilization?
  • Which statement best explains why shores on different floors should be aligned above and below each other?
  • If exact weight is not readily available, what method is commonly used to estimate the load weight?
  • Besides occupancy and the structure's condition, which information must be gathered?
  • Which factor is essential when selecting cribbing points for an unstable load?
  • Emergency shoring sequence: the load is collected by a header or wall plate, supported by posts, struts or rakers, and distributed to the structure below or opposite side.
  • Which factor is NOT typically considered when selecting cribbing components?
  • What components constitute a cribbing-based stabilization system?
  • Which practice helps prevent injuries during debris removal near sharp edges?
  • Precast construction parking facilities are generally how many stories tall?
  • In precast construction, the principal failure is due to the weakness of the connectors used to connect building parts; the weak connectors fail which creates many falling hazards as precast sections break loose and become unstable.
  • When cutting tensioned cables no more than _____ adjacent strands should be cut in each direction unless the structure has been collapsed and is being supported more or less uniformly. Within a building, an area within _____ feet each way of the centerline of the cable should be evacuated.
  • What temperature does an oxygen acetylene cutting torch average at?
  • What is a safe and effective approach to lighting a collapsed area for operations?
  • The acronym LACES stands for Lookouts, Awareness, Communications, Escape Routes, and Safe Zones.
  • What is the lifting capacity of a lattice bottom crane?
  • What is the primary concern during all emergency operations?
  • In a basement collapse with potential water intrusion, which safety consideration should guide the use of electrical equipment?
  • Why should you test a cribbed deck before standing on it?
  • In concrete structures, shoring should start at least how many good floors below the damaged level?
  • Structures that are heavy floor construction can be residential, commercial, or industrial, with concrete frames and may be up to twelve stories tall. This category includes highway bridges.
  • When selecting equipment for a task, what is essential to ensure safety?
  • In post-tensioned concrete cables, the greased strand is seven-strand and the wire diameter is half-inch; the tensile force is about 25,000 lbs.
  • What should be avoided to prevent electrocution when power cords are used?
  • Which description best fits triaging in collapse response?
  • Which structural category typically includes office, commercial, or industrial buildings and may include highway bridges?
  • Which elements constitute a redundant safety approach in US&R stabilization?
  • Which factor is explicitly listed as a knowledge item about a structural collapse?
  • Heavy wall construction buildings are one to eight stories in height and may be residential, commercial, industrial, or institutional, with heavy and thick walls and wooden or lightweight concrete floors.
  • Spontaneous rescuers present before the arrival of rescue personnel can be a significant resource if they are organized.
  • Which are critical signs of secondary collapse risk?
  • What is the primary approach to balancing rescue priorities when live victims and structural stabilization are both at stake?
  • What devices can detect sounds made by conscious victims buried deep within a collapsed structure?
  • What is the lifting capacity of a rough terrain crane?
  • In rigging, which factor describes how lines attach to the load?
  • The FEMA marking system labeling proceeds around the structure starting from the street side in which direction?
  • What atmospheric hazards must be considered in a collapse scene, and how are they monitored?
  • Wedge anchors should be tightened with what tool?
  • How do angles of attachment affect sling loads?
  • If high-tech devices are not available, drawing _____ lines over cracks and watching the lines move out of alignment or using an observer can assist with monitoring potential collapse.
  • How much water should you drink during extended operations?
  • Which area is listed as a potential survival area in a collapse?
  • What is the primary consideration when using a hydraulic jack?
  • Which are the main categories of cranes?
  • Which area is most likely to contain survivors in a collapse?
  • Emergency shores are primarily used to:
  • Which factors determine the amount and type of equipment needed to remove rubble?
  • The collapse _____ is how the building failed.
  • Which factor is used to estimate the weight of the object being lifted?
  • The lean to, V shape, A- Frame, pancake and cantilever are all types of _____ patterns.
  • Which construction category includes highway bridges?
  • How many phases are generally involved in a structural collapse rescue?
  • Which organization developed the building marking system?
  • Who should operate all heavy equipment?
  • Which pair completes the statement: 'Douglas Fir and Southern Pine are the two most common species used in cribbing and shimming loads'?
  • What is the purpose of establishing a safe operating zone during scene size-up?
  • In post-tensioned concrete, when is the steel tensioned?
  • Which set of noises can cause rescuer hearing damage?
  • What is the primary purpose of an 'exit plan' in a collapse operation?
  • Which term describes temporarily supporting a damaged structure to prevent further movement during rescue?
  • Which type of steel structures may be 2 to 100+ stories tall and include highway bridges?
  • What is the lifting capacity of a hydraulic crane?
  • In building triage, besides the type of structure, what factor must rescuers consider?
  • Post-tensioned cables use greased strands; the strand count is seven.
  • Which of the following is NOT one of the four heavy construction types?
  • When performing what type of triage do rescuers consider the structure type and likelihood of live victims?
  • Emergency shoring must be designed like a _____ funnel. The systems are designed to _____ the load with a header or wall plate, _____ the load with posts, struts or rakers and to _____ the load to the supporting structure below or to the opposite side through a sole plate of wall plate over a wide area.
  • How should you handle evidence and victim remains to preserve chain of custody?
  • Normal settlement and shifting debris, vibrations, and aftershocks can cause previously accessible void spaces to become inaccessible.
  • How do you determine if a structure is safe to approach after stabilization?
  • What is a primary objective of dewatering during a basement collapse?
  • Which of the following is NOT a listed collapse pattern?
  • What is the primary purpose of stabilization in relation to rescue operations?
  • Which property of concrete provides its primary resistance to being crushed under compression?
  • In wood or lightweight steel frame structures, shoring should start at least how many floors below the damaged floor?
  • OSHA 29 CFR 1926.550: What must be ensured regarding power lines during crane operation?
  • What characteristics should anchor points have in stabilization operations?
  • What is the role of redundancy in load paths within cribbing or shoring systems?
  • Which of the following is a key collapse indicator that suggests progressive instability in a structure?
  • In breaching operations, which is a hazard related to moving loads?
  • What does three-point lighting entail in collapse operations?
  • What does a post-stabilization re-assessment typically involve?
  • If a cervical spine injury is suspected during extraction, what packaging step should be taken?
  • What is the standard unit weight used for concrete in shoring calculations?
  • In a ventilation management plan, what does equalizing pressure accomplish?
  • Which symbol indicates that all confirmed victims have been removed?
  • Which arrangement best describes keeping new workers from being relieved at the same time while hands-on work continues?
  • The time of the day is a critical factor when combined with the occupancy type to help determine number of potential victims.
  • Which rescue approach is appropriate when victims are trapped in void spaces within a collapsed structure?
  • To prevent the Jack from sinking into the surface, what should you do?
  • Which equipment is used to monitor atmospheric hazards at a collapse scene?
  • How should utilities be managed at the scene to prevent energization or gas release?
  • When selecting lifting points for debris removal, what is the critical factor?
  • Why are ratchet jacks dangerous?
  • During heavy equipment operations, which method is combined with voice communications to overcome noise?
  • What is the greatest concern for rescuers during a structural collapse?
  • Which statement describes post-tensioned concrete?
  • Rescue tools include hand tools, power tools, and what other category?
  • When should stabilization occur relative to rescue operations?
  • What is the critical angle for lifting loads?
  • Chalk lines are used to monitor cracks because they provide a visible reference for movement.
  • Which statement best describes the standard shoring weights used for design calculations?
  • What are common limitations of airbag systems used in structural stabilization?
  • Cleaning or repairing assigned personnel protective equipment should be done according to whose recommendations?
  • The compressive strength in psi for Douglas Fir and Southern Pine when perpendicular to the grain is what value?
  • Why include contingency steps in a stabilization plan?
  • Heavy Floor construction structures often fall down on themselves (pancake), or may fall laterally if the columns are strong enough.
  • Irregular objects require stable lifting points and cribbing due to their surface area contact and center of gravity considerations.
  • What factor is essential when coordinating a multi-team response to a structural collapse?
  • Which of the following is NOT listed as a place where victims are likely to survive?
  • What angle should your rigging be between the load and the crane?
  • Which of the following is a factor you should know about a structural collapse?
  • When documenting stabilization actions, why should observed results be included?
  • Where is the highest survival rate for trapped victims typically near?
  • What practice helps maintain safety when working near high-tension hazards and heavy loads?
  • How can you verify that stabilization is effective before moving debris or rescuers?
  • What portion of the crew should be replaced at one time to allow new workers to acclimate to the plan and tactics?
  • Describe a safe method for creating a stable working platform above a collapsed floor.
  • Which option correctly describes a basic stabilization plan component for a collapsed structure?
  • _____ shear off segments of concrete towards an open space. Continuous hammering of solid concrete at right angles in ineffective because the bit will get stuck in a small crevice as you attempt to fight the concrete with _____ which is its strongest property.
  • How should gas detectors be used during a collapse operation?
  • Which option lists the three actions that safely mitigate a structural hazard?
  • When is it appropriate to use air- or hydraulic-powered shores in stabilization?
  • What should be included in an after-action training recap following a collapse incident?
  • Hazards such as aftershocks, secondary collapse, or secondary explosion may need to be mitigated at the scene prior to rescue operations.
  • Which of the following would be least helpful in identifying potential collapse patterns before entry?
  • Underground parking garages and basements are examples of areas where victims may survive but have limited or no escape.
  • The evaluation of building integrity in collapse incidents is commonly referred to as what?
  • In stabilization planning, what is the purpose of load path assessment?
  • Which construction type is built off-site and then put in place?
  • Which option completes 'Risk lives to' in the risk guidelines?
  • Which crew-rotation arrangement minimizes simultaneous relief of hands-on rescuers?
  • What is the role of the Incident Command System (ICS) in US&R Level II operations?
  • What is the purpose of tag lines and rigging when lifting debris?
  • Normal settlement and shifting debris, vibrations, and aftershocks can cause which type of collapse?
  • What should a pre-lift check of rigging and lifting equipment include?
  • Lighting a torch produces toxic ____ and flammable ____, which pair completes the sentence?
  • Before entering a space, how can potential collapse patterns be identified?
  • When is the greatest chance of survival for trapped victims?
  • The size of the structure and its construction type help determine the equipment needed to remove what material and debris?
  • What symbol is used to indicate that all confirmed victims have been removed?
  • What are the dangers of high-tension cables and heavy loads in collapse zones?
  • Foot protection requirements
  • What equipment is used for patient packaging in a collapsed structure?
  • How fast should you triage a building?
  • How can you manage the risk of entrapment during debris removal?
  • What is the primary priority during scene size-up in a structural collapse incident?
  • How can you prevent cribbing from sinking on soft soils or rubble?
  • What voltage batteries can be used for an exothermic torch?
  • Which area should be monitored for fall hazards due to gravity?
  • The building marking system was developed by FEMA.
  • Perpendicular to the grain rating for the two common cribbing species is approximately?
  • If the load is lifted to the right or left of the center of gravity, what will happen?
  • What is the purpose of a stabilization plan and what should it include?
  • What psi should the oxygen regulator be for an exothermic cutting torch?
  • What is a potential consequence of failing to deconflict tasks among teams during a multi-team response?
  • Special high strength cables used in concrete post-tensioned slabs consist of a greased, _____ strand, _____ inch diameter wire enclosed in a plastic sheath that is cast into the concrete. Before or after the concrete is hardened (depending on whether the structural member is pre or post tensioned), the cable is tensioned to about 25000 lbs.
  • What is a recommended approach to plan for potential water ingress in a basement collapse?
  • How often should you drink water during operations?
  • In what scenarios should you consider using mechanical advantage systems during debris removal?
  • What provides critical information about the structure's contents, informing victim condition and the protection needed for rescue personnel?
  • The principal failure due to weak connectors between floors, walls, and the roof, causing precast sections to break loose, is associated with which construction type?
  • Which statement correctly describes pre-tensioned concrete?
  • A personnel accountability system must be in place to keep track of all team members at all times through their supervisor and, if staffing allows, assign a personnel accountability _____ to conduct or supervise this important function.
  • Before lifting, which elements should be included in the stabilization plan and verification process?
  • How many victims will be rescued during the greatest survival window?
  • What practice helps reduce entrapment risk during debris removal?
  • Should you cut post tension cables?
  • Overhead _____ lines pose a great threat when operating a crane because power lines may be closer to the ground during structural collapse incident due to broke power poles or lowered building attachment points due to the collapse.
  • What are the two primary types of stabilization systems used in US&R Level II operations?
  • Possible reactive cutting forces when operating a chain saw
  • Cribbing and lifting point selection should consider stability of the lifting points.
  • How should electrical hazards be addressed at a collapse site?
  • Which action best supports ongoing stabilization during a lift if conditions change?
  • When documenting stabilization actions on scene, which information should be recorded?
  • Rebar provides concrete with which type of strength?
  • OSHA 29 CFR 1910.269: What is the crane minimum clearance distance from power lines?
  • During breaching operations, which of the following is a hazard related to heat?
  • What is the value of conducting thorough scene documentation during stabilization?
  • Explain the concept of 'load path' in structural collapse stabilization.
  • During debris management around a void space, which removal approach is appropriate?
  • Rescuers must understand the uses and limitations of heavy ______.
  • Why is there a danger in over-stabilizing a collapse scene?
  • Why is it important to avoid rapid or uncontrolled debris removal before stabilization?
  • What tool is well suited for cutting through heavy metal structures, and is used primarily to cut steel reinforcing plates, beams and cables?
  • For multi-floor shoring, shores on different floors should be aligned in which relation to each other?
  • How can you ensure accurate timekeeping and handoffs during operations?
  • Which PPE items must be worn during stabilization and extrication work?
  • Which is the correct expansion of the acronym LACES?
  • What is the purpose of using a '3-point' or 'three-person' technique in cribbing?